Wind farm in a mountain with the sun rising Wind farm in a mountain with the sun rising
Wind

Wind Farm Performance Assessment And Optimisation

Nov. 17, 2023
2 minutes

Wind Farm Performance Assessment And Optimisation

Optimising wind farm production, and hence its revenues, is a key element in wind farm operation management. Understanding downfalls and issues impacting a wind farm is therefore paramount to then apply corrections and optimise the wind turbines’ operation and power production.

 

 

How Greensolver can help?    

SCADA Analysis graph

 

Greensolver analyzes SCADA data and conducts on-site inspections to identify and confirm issues with wind turbines. To optimize the performance of wind farms, Greensolver can suggest corrective measures.

SCADA data analysis can also flag underperformance by comparing the actual measured power curve with the warranted power curve. This is particularly important during the power curve guarantee period, as this can support the decision for the need for a costly power curve verification test. Greensolver discovered turbine underperformance at a French wind farm through SCADA data analysis. Our client contacted the manufacturer for corrective action based on our recommendations.

 

 

Another important aspect of a wind farm performance assessment is to recalculate the expected long-term energy yield of the wind farm, based on the operational data, via a post-construction energy yield assessment (PCYA). Pre-construction energy yield assessments (EYA) can sometimes overestimate the wind farm’s energy yield. Compared to EYA, PCYA reduces annual energy production uncertainty by 50%. This is particularly important in the case of refinancing the project or for a project acquisition. We have seen in some cases significant P50 overpredictions for some wind farms (up to +18%!).

A SCADA data assessment can help in calibrating the wind flow modeling to match actual production data. As in older projects, this wind flow model can be used for repowering or expanding wind farms, reducing uncertainty in AEP, and preventing over-predictions of wind resources.

 

 

Greensolver can carry out a full wind farm performance assessment (desktop and on-site inspection) to support its clients in optimizing their asset-generated revenues, capitalizing on the synergy of its Advisory and Asset Management teams.

 

 

To know more about our advisory services, Email us at contact@greensolver.net

 

Written by Edward Burin Des Roziers, Advisory Consultant 

Blog

The Latest Renewable Energy News

Greensolver at the UK Solar Summit — London, 30th of June 2026

Greensolver at Intersolar Europe — Munich, 23-25th June 2026

Webinar — How to Manage Uncertainty in BESS | 17 June, 2 p

Greensolver at the Régate EnR — On board the Lucille Experience, Montpellier, 17–18 June

Greensolver at the Colloque National Photovoltaïque — Strasbourg, 9th June

Greensolver at Inspiratia Datacentres: Power, Risk & Resilience — London, 18 June

Case Study 2 – Portfolio of 10 projects -15MW AgriPV Technical Due Diligence for Bank Financing

Greensolver will be at Solarplaza France – June 3rd

Solar panels with a human and its tablet and helmet

Case Study : Estimated Yield Assessment for Complex AgriPV Systems

Resources and insights Wind Farm Performance Assessment And Optimisation