battery energy storage system with solar panels and wind turbines behind battery energy storage system with solar panels and wind turbines behind
Bess

Tales of BESS #1 - Case Study : Root Cause Analysis

Jun. 18, 2025
1 minute

Root Cause Analysis – Internal Communication issue: 20MW / 20MWh (UK)

The client was looking for an independent third party to review a 20MW/20MWh BESS asset capability to enter and participate in ancillary services (DC/DM/DR) as well as assessing the overall reliability of the control systems (coms between RTM, SCADA and BESS/PCS)​.

 

 

Greensolver team has been appointed to establish the root cause of 3 main issues encountered during the SAT period, and evaluate the reliability of the mitigation action carried out :

  • Issue 1: communication misfunction between the Battery OEM’s BMS and the PLC of the SCADA
  • Issue 2: impossibility to pass the tests for DC, DM et DR services
  • Issue 3: communication outage between Battery containers and the PLC of the SCADA

Greensolver also assessed in parallel the Balancing Strategy of the Battery OEM.

Greensolver team well conducted the analysis by flagging the root cause and mitigation action reliability:

  • Issue 1: bad MODBUS protocol configuration due to uncompliant MSS setting in the Battery OEM BMS
  • Issue 2: uncompliant operational policy of the Battery BMS during standby period leading to greater latency of the system response and preventing being compliant with DC/DM/DR requirements
  • Issue 3: uncompliant MODBUS protocol configuration following the mitigation action done to solve issue 2

Regarding Balancing Strategy, main risks raised concerned improving the SOC calibration and SOC calculation accuracy.

Written by David Roissé

Blog

The Latest Renewable Energy News

PRESS RELEASE – Greensolver partners with Tipspeed to strengthen wind farm performance services

Battery Energy Storage Systems with solar panels next to it

Greensolver will be in London for the Solar and Storage Live – April 29th

Wind farm with sunset

Greensolver will participate in the WindEurope 2026 in Madrid – April 21st

Battery Energy Storage Systems in a field with sunrising

Reshaping France’s Renewable Energy Market: The Role of BESS under PPE 3

Construction of solar panels with humans dressed for construction

Updates on Technical and Commercial Asset Management service in 2026

People smiling at corporate event

Greensolver will participate in the Energyear 2026 in Madrid – March 24 & 25

Solar panels in line

Design Choices That Define Lifetime Performance

Greek flag with sun and blue sky

How to Build Reliable BESS Projects in Greece?

Conference energyear 2025

Greensolver will participate in the Energy Storage Summit 2026 in London – February 24 & 25

Resources and insights Tales of BESS #1 – Case Study : Root Cause Analysis