We have often seen cases when an active filter had to be installed during operation of a wind farm. This article aims to demonstrate their purpose and benefits.

From high voltage centres, grid operators use a remote system to amend the tariff in energy meters. When a tariff signal is issued, each simple voltage imposed by the three-phase network is the superposition of the sinusoidal voltage V50 Hz and of a square alternating voltage V175 Hz.

 

 

Some grid connection configurations can have a negative impact on those tariff signal. This is for example the case when new autonomous producers (wind turbine, small hydro or gas station) want to connect their unit to the grid.

Wind active filter with cables

For the operating wind farm, it has to be carefully checked that this new disposition doesn’t affect the tariff order. This can be done by estimating upstream & downstream 175 Hz signals of the new installation. If after proper control upstream & downstream levels overpass the thresholds, an active filter will need to be implemented on the operating wind farm.

If tariff signal is perturbated due to a new installation, the new producer will be required to install an active filter or at least, participate in financing it. The amount of the financial participations depends on the loss of signal it generates.

 

 

How can Greensolver help?

 

 

Greensolver, technical expert for wind & solar assets, can advise any operator on how to implement an active filter on operating or ready to build wind farm. We can bring you all the necessary support to assess the impact on your wind asset, contact us if you have any questions!

Blog

The Latest Renewable Energy News

Webinar Replay – Modeling the Economic Potential of BESS: How to Manage Uncertainty | June 17, 2:00 p.m. CET

Greensolver will be attending the 12th GreenUnivers Infrastructure Financing Conference on July 1

Greensolver at the National Event on “Flexibility in Renewable Energy and Storage” — July 2

Greensolver at the Wind Power Finance & Investment Summit 2026 – London, 1st of July

Compliance Monitoring at GW Scale: Why the Best Large Operators Get Better, Not Busier

Aerial view of solar panels lined up in a field

Greensolver at the UK Solar Summit — London, 30th of June 2026

Talks with people eating and drinking in front of the stands

Greensolver at Intersolar Europe — Munich, 23-25th June 2026

Plant in front of a computer showing a webinar presentation

Webinar — How to Manage Uncertainty in BESS | 17 June, 2 p

People in a boat looking at the camera and waving hands

Greensolver at the Régate EnR — On board the Lucille Experience, Montpellier, 17–18 June

Resources and insights Why active filters are to be used in a wind energy asset?