The Importance of Quality Control of Photovoltaic Modules

Oct. 17, 2023
3 minutes

The Importance of Quality Control of Photovoltaic Modules

The importance of the photovoltaic module quality control process is growing among Investors, although its implementation in large-size plants > 10MW can trigger possible delays in the installation of the modules.  

Not doing the flash tests when the modules arrive on site can lead to unpleasant surprises such as not meeting the power values ​​guaranteed by the manufacturer according to its “flash list”, most likely the installation cannot reach the production target and warranty performance ratio from the EPC. 

Greensolver’s Advice

It is recommended to inspect the container seals upon delivery of the modules to the site. This is to ensure that no one outside of the carrier has tampered with them. Inspection of all the modules upon delivery is recommended. It is also recommended to inspect all the modules upon delivery. In case of any damage to them, you can claim the manufacturer. Normally you have 5 days for inspection and claim. 

Once this first inspection is done, in order to control the power supplied by the manufacturer, a random sample of modules is submitted to independent laboratories assigned by the manufacturer to measure their power and do electroluminescence (EL) tests (to verify that the modules have not been damaged during transport and/or assembly). These values are compared with the datasheet provided by the Manufacturer, in what is called a “Flash Test”. 

A key point to keep in mind is that the Flash Test values ​​have been measured under Standard Test Conditions (25ºC and 1000 W/m2), for this reason, these tests are made in specialized laboratories, but it has the problem that normally a very small sample of the modules is sent around 20-50 modules.

For a larger plant sample, use a calibrated device that responds to environmental changes similarly to the module. For example, PVPM1000, HT, and Tri-ka.

Greensolver recommends testing and verifying that the module manufacturer’s flash test matches measurements in both the lab and the field.

To know more about our asset management services, Email us at contact@greensolver.net 

Written by Alberto Santos, Asset Manager

Blog

The Latest Renewable Energy News

Solar panels with sheeps around like agri-pv

Agrivoltaics – Dual Land Use, New Incentives, and Market Opportunities

Handshaking by two women

Why will certifications become necessary in 2026?

Solar Panel with Blue sky

Grid Availability and Curtailment: The Hidden Drivers of Solar Asset Performance

Sun with ondulations in purple

Smart Coexistence: When Sheep, Solar, and AI Work Together

Team of people at a conference

Greensolver will be in Montpellier for Energaia – 10 of december

Battery energy storage open

What the Update to NFPA 855 Means for Energy Storage Safety ?

Battery energy storage open with cables

Tales of BESS #11 – Case study: Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR) 

Battery energy storage contener

Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC) 

Solar farm with solar panels with grass

Safety Concerns in Single-Axis Tracker PV Plants: Risks and Mitigation Strategies

Resources and insights The Importance of Quality Control of Photovoltaic Modules