According to the ICPE decree of the 10/12/2021, blades inspection must be carried out every 6 months. The O&M provider carry out one annual blade inspection. Complementary, Greensolver proposes to lead on wind farms the 2nd blade inspection for each turbine.

 

Advantage : The blade inspection by a third party will allow to detect and analyze the damage complementary to the annual inspection lead by the O&M provider. This second opinion will push the O&M provider to be more pro-active on the follow-up of this component of the turbines and will allow to trigger repairs if needed.

 

 

Three type of blade inspection can be performed :

  • Ground inspection using photograph equipment (high quality camera) : visual inspection and photograph from the turbine bottom. Precise and useful for defect follow-up.
  • Drone inspection : visual inspection and photographic using a drone. Precise and useful for defect follow-up. Depending on the provider, the stop of the turbine is not always needed.
  • Rope access technician inspection : a technician access to the blade using rope, enabling him to inspect directly the blade.

 

 

This type of inspection is heavier to organize and more expensive. The leading edge, trailing edge are inspected, defects can take the form of cracks, erosion or lightning impacts.

 

These defects can lead to :

  • Aerodynamic performance loss
  • Defect propagation and increasing repair cost
  • Major accident risk
Blade drawing
Blade inspection with a drone
Blade inspection with a safety person

Contact our team of experts to schedule a meeting

Contact us Contact us
Blog

The Latest Renewable Energy News

AMPYR Distributed Energy: Technical Asset Management of a 70 MW pan-European solar portfolio

Webinar Replay – Modeling the Economic Potential of BESS: How to Manage Uncertainty | June 17, 2:00 p.m. CET

Greensolver will be attending the 12th GreenUnivers Infrastructure Financing Conference on July 1

Greensolver at the National Event on “Flexibility in Renewable Energy and Storage” — July 2

Greensolver at the Wind Power Finance & Investment Summit 2026 – London, 1st of July

Compliance Monitoring at GW Scale: Why the Best Large Operators Get Better, Not Busier

Aerial view of solar panels lined up in a field

Greensolver at the UK Solar Summit — London, 30th of June 2026

Talks with people eating and drinking in front of the stands

Greensolver at Intersolar Europe — Munich, 23-25th June 2026

Plant in front of a computer showing a webinar presentation

Webinar — How to Manage Uncertainty in BESS | 17 June, 2 p

Resources and insights Tales of Wind #6 – Blade inspection