Tales of BESS #7 - Case Study: SOC discrepancy : 32MW / 32MWh (UK)

Aug. 18, 2025
2 minutes

SOC discrepancy : 32MW / 32MWh (UK)

 

 

The BESS is operated by the Technical Asset Management team of Greensolver on the behalf of the Asset owner. The BESS is 32MW / 32MWh located in UK.

As part of the TAM scope of services, Greensolver team used on daily basis the Safety & Performance analytic tool BatteryInsight to ensure the SOC figures accuracy.

 

 

Wrong SOC figures given by the BMS and used by the RTM operator led to operational discrepancies and imbalances for the WM position and DFR services, which end by lost of revenues.

Thanks to the raw data: Temperature, Voltage and Current given by the SCADA/BMS at Battery racks level, Greensolver team was able to highlight SOC deviation between the SOC figures given by the BMS on site and the SOC figures calculated by BatteryInsight.

 

 

As part of the Performance feature of the tool, recurrent SOC deviation alarms was triggered, highlighting potential SOC calculation issue by the BMS from commissioning date. Below summary of the action plan managed by Greensolver team:

  • First action: by tracking those alarms, Greensolver team could focus cause on the BMS
  • Second action: Greensolver team requested remedial action to the Battery OEM
  • Third action: Battery OEM performed a software update of the BMS to improve the SOC calculation

 

 

From the date of the software update, no more critical SOC deviation alarm have been raised. RTM operator gained in visibility to position the asset on the market applications reducing the risk of discrepancy.

Graph asset output
Écart graphique SOC

Written by David Roissé

Blog

The Latest Renewable Energy News

Phone with stats

Why the Portfolio Effect Is a Game-Changer in Solar Investment

Protected: Wind Turbine Maintenance: A Guide for Asset Owners and Investors

Picture of Paris from above with the Eiffel Tower

Greensolver at the Solar and Storage Paris – 14-15 October 2026

Big Ben in London with sunset

Greensolver at the Battery Asset Management Summit UK & Ireland – 13-14 October 2026

Picture of Marie Bartle

Press Release – Marie Bartle Joins Greensolver as BESS Director

Presentation of a new colleague

Marie Bartle Joins Greensolver as BESS Director

Wind Turbine in the middle of clouds

Wind farm performance: why standard monitoring often misses the real picture

Concert room with many people

Greensolver will be at 27th Annual Submit of French Renewable Energy Trade Association – 29th of September

Weeding room with people getting married

Greensolver will be at Solar and Storage Birmingham – 22-24 of September

Resources and insights Tales of BESS #7 – Case Study: SOC discrepancy : 32MW / 32MWh (UK)