Tales of BESS #5 - Case Study: Safety & Performance Analysis under TAM contract

Jul. 18, 2025
1 minute

Safety & Performance Analysis under TAM contract: 32MW / 32MWh (UK)

 

 

The BESS is operated by the Technical Asset Management team of Greensolver on the behalf of the Asset owner. The BESS is 32MW / 32MWh located in UK.

As part of the TAM scope of servicesGreensolver team led an analysis to check Safety & Performance status of the plant, throughout a 8 months operational period.

Greensolver team conducted the analysis with the support of an Analytic tool provided by a third-party partner.

 

 

Thanks to the raw data: Temperature, Voltage and Current given by the SCADA at Battery rack level, Greensolver was able to analyse :

  • State-of-Safety: by tracking over-voltage / over-temperature / cell imbalance to prevent Thermal Runaway
  • Performance: by checking estimation and accuracy of SOC and SOH / BMS faults
  • Lifetime: by checking operational condition vs battery OEM requirements (temperature, C-Rate)

 

 

This Safety & Performance analysis allowed to highlight issues, which have been then raised to the battery OEM :

  • State-of-Safetyfrequent cell imbalance caused by weak cells, which could then lead to over-voltage and over-charge in the Battery cells and at the end Thermal Runaway
  • Performanceremaining useful capacity (SOH) below the warranty of the battery OEM / frequent faulty measurement of the BMS, leading to SOC deviation (wrong voltage measurement)
  • Lifetime: higher temperature of the battery module than recommended, which could accelerate the ageing
Illustration of rack voltages wrong monitoring
Rest conditions graph

Written by David Roissé

Blog

The Latest Renewable Energy News

Webinar Replay – Modeling the Economic Potential of BESS: How to Manage Uncertainty | June 17, 2:00 p.m. CET

Greensolver will be attending the 12th GreenUnivers Infrastructure Financing Conference on July 1

Greensolver at the National Event on “Flexibility in Renewable Energy and Storage” — July 2

Greensolver at the Wind Power Finance & Investment Summit 2026 – London, 1st of July

Compliance Monitoring at GW Scale: Why the Best Large Operators Get Better, Not Busier

Aerial view of solar panels lined up in a field

Greensolver at the UK Solar Summit — London, 30th of June 2026

Talks with people eating and drinking in front of the stands

Greensolver at Intersolar Europe — Munich, 23-25th June 2026

Plant in front of a computer showing a webinar presentation

Webinar — How to Manage Uncertainty in BESS | 17 June, 2 p

People in a boat looking at the camera and waving hands

Greensolver at the Régate EnR — On board the Lucille Experience, Montpellier, 17–18 June

Resources and insights Tales of BESS #5 – Case Study: Safety & Performance Analysis under TAM contract