Pre-planning permission application submission Review: 100MW / 100MWh (UK)

The client was looking for an independent third party to review a  100MW/100MWh BESS asset’s general layout and design before pre-planning application to identify any key design flaws/red flags and discuss findings.

Greensolver team reviewed the planning drawings, the flood risk assessment, the noise impact assessment and the fire risk management strategy.

Greensolver team well conducted the analysis by flagging key things to anticipate before planning application, as :

General Layout :

  • Land area : ensure compatible activity presence around the site
  • Access : ensure efficient access during Construction phase (trucks and construction equipment) and during Operation phase (fire safety services, O&M provider vehicle )
  • Internal circulation : ensure operational efficiency safety and manutention
  • Noise mitigation : ensure noise level mitigation
  • Vegetation management : ensure consistency between regulation (National Plant Specification) and operation

Flood Risk :

  • Compatibility of the equipment Layout with the Local Flood Risk Assessment
  • Consistency of the Drainage equipment to be installed

Fire Risk : as per Standards (NFPA855) and battery OEM requirements

  • Procedure : ensure Safety of personnel and equipment
  • Equipment design : ensure Detection and Suppression
  • Site layout : mitigation of Fire Spread and efficient evacuation
Battery energy storage system map

Written by David Roissé

Blog

The Latest Renewable Energy News

Solar panels with sheeps around like agri-pv

Agrivoltaics – Dual Land Use, New Incentives, and Market Opportunities

Handshaking by two women

Why will certifications become necessary in 2026?

Solar Panel with Blue sky

Grid Availability and Curtailment: The Hidden Drivers of Solar Asset Performance

Sun with ondulations in purple

Smart Coexistence: When Sheep, Solar, and AI Work Together

Team of people at a conference

Greensolver will be in Montpellier for Energaia – 10 of december

Battery energy storage open

What the Update to NFPA 855 Means for Energy Storage Safety ?

Battery energy storage open with cables

Tales of BESS #11 – Case study: Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR) 

Battery energy storage contener

Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC) 

Solar farm with solar panels with grass

Safety Concerns in Single-Axis Tracker PV Plants: Risks and Mitigation Strategies

Resources and insights Tales of BESS #3 – Case Study: Pre-planning permission application submission review