Pre-planning permission application submission Review: 100MW / 100MWh (UK)

 

 

The client was looking for an independent third party to review a  100MW/100MWh BESS asset’s general layout and design before pre-planning application to identify any key design flaws/red flags and discuss findings.

Greensolver team reviewed the planning drawings, the flood risk assessment, the noise impact assessment and the fire risk management strategy.

 

 

Greensolver team well conducted the analysis by flagging key things to anticipate before planning application, as :

General Layout :

  • Land area : ensure compatible activity presence around the site
  • Access : ensure efficient access during Construction phase (trucks and construction equipment) and during Operation phase (fire safety services, O&M provider vehicle )
  • Internal circulation : ensure operational efficiency safety and manutention
  • Noise mitigation : ensure noise level mitigation
  • Vegetation management : ensure consistency between regulation (National Plant Specification) and operation

Flood Risk :

  • Compatibility of the equipment Layout with the Local Flood Risk Assessment
  • Consistency of the Drainage equipment to be installed

Fire Risk : as per Standards (NFPA855) and battery OEM requirements

  • Procedure : ensure Safety of personnel and equipment
  • Equipment design : ensure Detection and Suppression
  • Site layout : mitigation of Fire Spread and efficient evacuation
Battery energy storage system map

Written by David Roissé

Blog

The Latest Renewable Energy News

PRESS RELEASE – Greensolver partners with Tipspeed to strengthen wind farm performance services

Battery Energy Storage Systems with solar panels next to it

Greensolver will be in London for the Solar and Storage Live – April 29th

Wind farm with sunset

Greensolver will participate in the WindEurope 2026 in Madrid – April 21st

Battery Energy Storage Systems in a field with sunrising

Reshaping France’s Renewable Energy Market: The Role of BESS under PPE 3

Construction of solar panels with humans dressed for construction

Updates on Technical and Commercial Asset Management service in 2026

People smiling at corporate event

Greensolver will participate in the Energyear 2026 in Madrid – March 24 & 25

Solar panels in line

Design Choices That Define Lifetime Performance

Greek flag with sun and blue sky

How to Build Reliable BESS Projects in Greece?

Conference energyear 2025

Greensolver will participate in the Energy Storage Summit 2026 in London – February 24 & 25

Resources and insights Tales of BESS #3 – Case Study: Pre-planning permission application submission review