Solar farm with solar panels with grass Solar farm with solar panels with grass
Pv solar

Causes of PID

Feb. 16, 2020
2 minutes

Causes of PID

What is PID?

 

 

Potential Induced Degradation (PID) is due to a high potential difference between the semiconductor material (cell) and other parts of the module (glass, mount or aluminium frame). This potential difference creates a current leakage, resulting in the migration of negative and positive ions. Negative ions flow out via the aluminium frame, whilst positive ions (sodium ions) migrate to the cell surface. These “pollute” the cell by reducing its photovoltaic effect, leading to power losses. PID effects can be responsible for power losses of up to 20% and the effects are not immediately noticeable – it can take several months to a few years.

 

 

Causes of PID

 

 

The PID is closely linked to environmental factors (humidity, temperature) and the configuration of the PV system (grounding, module and cell type).

Environmental factors : The ion mobility accelerates with humidity and temperature, increasing the PID effect. However, these are parameters that cannot be influenced.

System configuration : The voltage potential and sign of the module have an impact on the PID occurrence. It depends on the position of the panel in the array and the system earthing. Most of the time, PID is related to a negative voltage potential to earth, the more negative panel will be the panel at most risk.  

 

 

Module composition : Recent research has shown that the chemical composition of glass, encapsulating material or anti-reflective coating, has a considerable impact on the occurrence of PID. For example the sodium contained in the glass is a cause of PID. The resistance to moisture of the used material is also a determining factor since it increases conductivity and therefore, ion migration.

By Clément Vinet, Asset Manager

Blog

The Latest Renewable Energy News

Phone with stats

Why the Portfolio Effect Is a Game-Changer in Solar Investment

Protected: Wind Turbine Maintenance: A Guide for Asset Owners and Investors

Picture of Paris from above with the Eiffel Tower

Greensolver at the Solar and Storage Paris – 14-15 October 2026

Big Ben in London with sunset

Greensolver at the Battery Asset Management Summit UK & Ireland – 13-14 October 2026

Picture of Marie Bartle

Press Release – Marie Bartle Joins Greensolver as BESS Director

Presentation of a new colleague

Marie Bartle Joins Greensolver as BESS Director

Wind Turbine in the middle of clouds

Wind farm performance: why standard monitoring often misses the real picture

Concert room with many people

Greensolver will be at 27th Annual Submit of French Renewable Energy Trade Association – 29th of September

Weeding room with people getting married

Greensolver will be at Solar and Storage Birmingham – 22-24 of September

Resources and insights Causes of PID