battery energy storage system with solar panels and wind turbines behind battery energy storage system with solar panels and wind turbines behind
Bess

Tales of BESS #8 - Case Study: Invoicing Statements control: 20MW / 20MWh (UK)

Sep. 23, 2025
1 minute

Invoicing Statements control: 20MW / 20MWh (UK)

 

 

The BESS is operated by the Technical Asset Management team of Greensolver on the behalf of the Asset owner. The BESS is 20MW / 20MWh located in UK.

As part of the TAM scope of servicesGreensolver team review the Monthly invoicing Statements to ensure the accuracy and reliability of the figures.

 

 

Complexity of the Invoicing process due to multiple market applications and multiple data sources, could lead to fortuitous missing revenue.

Thanks to our expertise of the UK market and comprehension of each Market articulations and rulesGreensolver team highlighted, during the Onboarding process of the Technical Asset management contract, multiple errors in the Invoicing Statements of the last 8 months.

 

 

Those errors represented around 180 k£ of missing revenues for the SPV and its Asset Owner.

Greensolver team claimed the missing revenues to the RTM operator, which proceeded to reconciliation of the Invoices.

Icons green
Blog

The Latest Renewable Energy News

Greensolver is the New Member of the UK’s Energy Storage Network

Press Release – Greensolver partners with Aevy to enhance asset management through AI-powered document intelligence

PRESS RELEASE – Greensolver partners with Tipspeed to strengthen wind farm performance services

Battery Energy Storage Systems with solar panels next to it

Greensolver will be in London for the Solar and Storage Live – April 29th

Wind farm with sunset

Greensolver will participate in the WindEurope 2026 in Madrid – April 21st

Battery Energy Storage Systems in a field with sunrising

Reshaping France’s Renewable Energy Market: The Role of BESS under PPE 3

Construction of solar panels with humans dressed for construction

Updates on Technical and Commercial Asset Management service in 2026

People smiling at corporate event

Greensolver will participate in the Energyear 2026 in Madrid – March 24 & 25

Solar panels in line

Design Choices That Define Lifetime Performance

Resources and insights Tales of BESS #8 – Case Study: Invoicing Statements control: 20MW / 20MWh (UK)
Tournez le téléphone

Stay up-to-date with the latest news

    Thank you for subscribing! You’ve been added to our newsletter list and will start receiving updates soon.

    Contact us

      Your message has been sent successfully!