Tales of BESS #7 - Case Study: SOC discrepancy : 32MW / 32MWh (UK)

Aug. 18, 2025
2 minutes

SOC discrepancy : 32MW / 32MWh (UK)

 

 

The BESS is operated by the Technical Asset Management team of Greensolver on the behalf of the Asset owner. The BESS is 32MW / 32MWh located in UK.

As part of the TAM scope of servicesGreensolver team used on daily basis the Safety & Performance analytic tool BatteryInsight to ensure the SOC figures accuracy.

 

 

Wrong SOC figures given by the BMS and used by the RTM operator led to operational discrepancies and imbalances for the WM position and DFR serviceswhich end by lost of revenues.

Thanks to the raw data: Temperature, Voltage and Current given by the SCADA/BMS at Battery racks level, Greensolver team was able to highlight SOC deviation between the SOC figures given by the BMS on site and the SOC figures calculated by BatteryInsight.

 

 

As part of the Performance feature of the tool, recurrent SOC deviation alarms was triggered, highlighting potential SOC calculation issue by the BMS from commissioning date. Below summary of the action plan managed by Greensolver team:

  • First action: by tracking those alarms, Greensolver team could focus cause on the BMS
  • Second actionGreensolver team requested remedial action to the Battery OEM
  • Third actionBattery OEM performed a software update of the BMS to improve the SOC calculation

 

 

From the date of the software updateno more critical SOC deviation alarm have been raised. RTM operator gained in visibility to position the asset on the market applications reducing the risk of discrepancy.

Graph asset output
Écart graphique SOC

Written by David Roissé

Blog

The Latest Renewable Energy News

Webinar Replay – Modeling the Economic Potential of BESS: How to Manage Uncertainty | June 17, 2:00 p.m. CET

Greensolver will be attending the 12th GreenUnivers Infrastructure Financing Conference on July 1

Greensolver at the National Event on “Flexibility in Renewable Energy and Storage” — July 2

Greensolver at the Wind Power Finance & Investment Summit 2026 – London, 1st of July

Compliance Monitoring at GW Scale: Why the Best Large Operators Get Better, Not Busier

Aerial view of solar panels lined up in a field

Greensolver at the UK Solar Summit — London, 30th of June 2026

Talks with people eating and drinking in front of the stands

Greensolver at Intersolar Europe — Munich, 23-25th June 2026

Plant in front of a computer showing a webinar presentation

Webinar — How to Manage Uncertainty in BESS | 17 June, 2 p

People in a boat looking at the camera and waving hands

Greensolver at the Régate EnR — On board the Lucille Experience, Montpellier, 17–18 June

Resources and insights Tales of BESS #7 – Case Study: SOC discrepancy : 32MW / 32MWh (UK)