battery energy storage system with solar panels and wind turbines behind battery energy storage system with solar panels and wind turbines behind
Bess

Tales of BESS #3 - Case Study: Pre-planning permission application submission review

Jul. 18, 2025
1 minute

Pre-planning permission application submission Review: 100MW / 100MWh (UK)

 

 

The client was looking for an independent third party to review a  100MW/100MWh BESS asset’s general layout and design before pre-planning application to identify any key design flaws/red flags and discuss findings.

Greensolver team reviewed the planning drawings, the flood risk assessment, the noise impact assessment and the fire risk management strategy.

 

 

Greensolver team well conducted the analysis by flagging key things to anticipate before planning application, as :

General Layout :

  • Land area : ensure compatible activity presence around the site
  • Access : ensure efficient access during Construction phase (trucks and construction equipment) and during Operation phase (fire safety services, O&M provider vehicle )
  • Internal circulation : ensure operational efficiency safety and manutention
  • Noise mitigation : ensure noise level mitigation
  • Vegetation management : ensure consistency between regulation (National Plant Specification) and operation

Flood Risk :

  • Compatibility of the equipment Layout with the Local Flood Risk Assessment
  • Consistency of the Drainage equipment to be installed

Fire Risk : as per Standards (NFPA855) and battery OEM requirements

  • Procedure : ensure Safety of personnel and equipment
  • Equipment design : ensure Detection and Suppression
  • Site layout : mitigation of Fire Spread and efficient evacuation
Battery energy storage system map

Written by David Roissé

Blog

The Latest Renewable Energy News

Greensolver will participate in the Energyear 2026 in Madrid – March 24 & 25

Solar panels in line

Design Choices That Define Lifetime Performance

How to Build Reliable BESS Projects in Greece?

Conference energyear 2025

Greensolver will participate in the Energy Storage Summit 2026 in London – February 24 & 25

Data Centers and Renewable Energy in Europe: The Symbiosis Redefining Investment

Greensolver unveils a new brand identity and website to better serve renewable energy stakeholders

PRESS RELEASE – Greensolver Reinvents Its Brand Identity to Deliver Technical and Financial Value

Spain’s Renewable Energy Landscape 2026 : Opportunities and Challenges

Women clapping in an office

Greensolver will be in the 2nd Flexibility and Storage Event by GreenUnivers – 5th of february

Resources and insights Tales of BESS #3 – Case Study: Pre-planning permission application submission review