battery energy storage system with solar panels and wind turbines behind battery energy storage system with solar panels and wind turbines behind
Bess

Tales of BESS #1 - Case Study : Root Cause Analysis

Jun. 18, 2025
1 minute

Root Cause Analysis – Internal Communication issue: 20MW / 20MWh (UK)

The client was looking for an independent third party to review a 20MW/20MWh BESS asset capability to enter and participate in ancillary services (DC/DM/DR) as well as assessing the overall reliability of the control systems (coms between RTM, SCADA and BESS/PCS)​.

Greensolver team has been appointed to establish the root cause of 3 main issues encountered during the SAT period, and evaluate the reliability of the mitigation action carried out :

  • Issue 1: communication misfunction between the Battery OEM’s BMS and the PLC of the SCADA
  • Issue 2: impossibility to pass the tests for DC, DM et DR services
  • Issue 3: communication outage between Battery containers and the PLC of the SCADA

Greensolver also assessed in parallel the Balancing Strategy of the Battery OEM.

Greensolver team well conducted the analysis by flagging the root cause and mitigation action reliability:

  • Issue 1: bad MODBUS protocol configuration due to uncompliant MSS setting in the Battery OEM BMS
  • Issue 2: uncompliant operational policy of the Battery BMS during standby period leading to greater latency of the system response and preventing being compliant with DC/DM/DR requirements
  • Issue 3: uncompliant MODBUS protocol configuration following the mitigation action done to solve issue 2

Regarding Balancing Strategy, main risks raised concerned improving the SOC calibration and SOC calculation accuracy.

Written by David Roissé

Blog

The Latest Renewable Energy News

Solar panels with sheeps around like agri-pv

Agrivoltaics – Dual Land Use, New Incentives, and Market Opportunities

Handshaking by two women

Why will certifications become necessary in 2026?

Solar Panel with Blue sky

Grid Availability and Curtailment: The Hidden Drivers of Solar Asset Performance

Sun with ondulations in purple

Smart Coexistence: When Sheep, Solar, and AI Work Together

Team of people at a conference

Greensolver will be in Montpellier for Energaia – 10 of december

Battery energy storage open

What the Update to NFPA 855 Means for Energy Storage Safety ?

Battery energy storage open with cables

Tales of BESS #11 – Case study: Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR) 

Battery energy storage contener

Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC) 

Solar farm with solar panels with grass

Safety Concerns in Single-Axis Tracker PV Plants: Risks and Mitigation Strategies

Resources and insights Tales of BESS #1 – Case Study : Root Cause Analysis