What renewable and storage asset owners need to know before the first auctions?
Abstract
Spain has created a capacity market for its peninsular electricity system. The European Commission approved a €9 billion mechanism, and Order TED/966/2026 established the market framework in September 2026. The mechanism is intended to remunerate firm capacity available when the system is under stress, alongside revenues from electricity sales. Will the new market create a bankable opportunity for renewable and storage assets, or will success depend on how well projects can prove their availability when the system needs them? For asset owners, the key question is no longer simply how much a plant can generate. It is how reliably it can contribute during system stress—and how that contribution will be measured.
Summary
Three questions for asset owners
1. The market rewards availability, not energy production
Capacity auctions will procure firm power, expressed in MW. Offers will be priced in euros per firm MW per year and awarded on a pay-as-bid basis. Successful providers will need to make their contracted capacity available during system stress hours, which may cover up to 10% of the hours in a calendar year. [1]
For example, a solar-plus-storage project should assess the firm capacity it can reliably offer rather than assume that its full installed capacity will qualify. Firmness coefficients and detailed verification requirements will be set through further regulatory development and auction notices. [1]
2. Storage and demand can participate, subject to the rules
The framework allows generation, storage, electricity consumers and demand aggregators to participate. It covers existing facilities and eligible new investments. New generation and storage investments awarded in main auctions may receive service periods of up to 15 years; the duration will depend on the technology and auction call. [1]
This creates a potential route to diversify project revenues. Participation will depend on meeting technical and regulatory requirements, including minimum firm-power thresholds and the rules for proving delivery.
3. Auction readiness will shape the opportunity
The market framework is in place, but important operating details—including the firmness methodology, technical requirements and verification procedures—will be developed further. Asset owners should assess eligibility, operational capability and potential obligations before committing to an auction strategy. [1]
The opportunity is real, but capacity revenues will depend on what a project can demonstrate and deliver, not only on its technology or installed capacity.
Conclusion
Spain’s capacity market could provide an additional revenue route for renewable, storage and demand-side assets. The challenge is to show that each project can deliver dependable capacity during periods of system stress. Preparing early can help asset owners understand their options as the first auction conditions are published.
How Greensolver can help
- Assess a project’s technical readiness and potential contribution of firm capacity.
- Review operational data, availability and constraints that may affect participation.
- Support technical due diligence and revenue assumptions for renewable and BESS projects.
- Help owners prepare questions and documentation for upcoming auction requirements.
Written by Alberto Ruiz, Asset Manager
Sources
[1] Official State Gazette (BOE), Order TED/966/2026, 15 September 2026: https://www.boe.es/buscar/act.php?id=BOE-A-2026-19329
[2] European Commission, “Commission approves €9 billion Spanish capacity mechanism for security of electricity supply,” 28 May 2026: https://ec.europa.eu/commission/presscorner/detail/en/ip_26_1163
Note: This Databyte provides an accessible overview of a developing regulatory framework. It is not legal or investment advice.