Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR) 

 

 

Greensolver performed the technical due diligence for a standalone BESS asset underdevelopment in France 17.75MW/35.5MWh.

The scope of the work covered:

  • Regulatory:
    • Review of ICPE requirements and tracking of its development
    • Application of evolving regulatory requirements to technical specifications

 

 

  • Technical:
    • Review of CATL’s BESS Model: EnerOne+
    • Site Assessment and Review of the proposed layout
    • Design review and capacity to operate on primary reserve markets
    • Contracts review (Warranty, EPC, and O&M)
    • Augmentation Strategy Evaluation
    • Review of compliance with evolving regulatory requirements

 

 

Through the review of the regulatory requirements and their anticipated changes, the technical capabilities of the BESS project were optimized to ensure compliance and mitigate potential risks. Such work was ensured by advising the owner to:

  • Acquisition of rights to neighboring land to facilitate regulatory developments
  • Amend site layout to ensure safety
  • Consideration of additional sub-systems
  • Negotiation of improved terms for the warranty and O&M terms

 

 

Written by Nikko Talplacido
Blog

The Latest Renewable Energy News

Greensolver will be at 27th Annual Submit of French Renewable Energy Trade Association – 29th of September

Greensolver will be at Solar and Storage Birmingham – 22-24 of September

Greensolver will present at the INES Solar Conference on September 15

Greensolver will be at European Power Investment Summit 2026 – 16st of September

Greensolver at the Onshore Wind Conference 2026 – 1st of September

AMPYR Distributed Energy: Technical Asset Management of a 70 MW pan-European solar portfolio

Webinar Replay – Modeling the Economic Potential of BESS: How to Manage Uncertainty | June 17, 2:00 p.m. CET

Greensolver will be attending the 12th GreenUnivers Infrastructure Financing Conference on July 1

Greensolver at the National Event on “Flexibility in Renewable Energy and Storage” — July 2

Resources and insights Tales of BESS #11 – Case study: Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR)