Battery energy storage contener Battery energy storage contener
Bess

Tales of BESS #10 - Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC) 

Oct. 2, 2025
2 minutes

Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC)

Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC)

 

 

As the Lender Technical Advisor, Greensolver conducted Technical Due Diligence for two standalone BESS assets 50MW/100MWh in the context of the project’s financing.

The scope of the work covered:

  • Regulatory:
    • Review of grant requirements and tracking of its development
    • Application of evolving regulatory requirements to technical specifications and financial model

 

 

  • Technical:
    • Review of CATL’s BESS (Model: EnerC+)
    • Review of the permits and licenses
    • Site Assessment and Review of the proposed layout
    • Design review and capacity to operate on primary reserve markets
    • Contracts review (Supply Agreement, EPC, and O&M)
    • Augmentation Strategy Evaluation
    • Review of grant compliance

 

 

  • Financial:
    • Review of the financial model, validating assumptions and proposing suitable parameters where required CAPEX, OPEX, budgets, revenues)
    • Review of grant compliance

 

 

Through the Greensolver’s audit of the project, the proposed system was found to be aligned with industry standards. Minor risk from the selected site was identified, with mitigation investigated and proposed. The Financial Model was found to require revision and was therefore updated to better reflect local conditions.

 

 

Written by Nikko Talplacido
Blog

The Latest Renewable Energy News

Greensolver at the UK Solar Summit — London, 30th of June 2026

Greensolver at Intersolar Europe — Munich, 23-25th June 2026

Webinar — How to Manage Uncertainty in BESS | 17 June, 2 p

Greensolver at the Régate EnR — On board the Lucille Experience, Montpellier, 17–18 June

Greensolver at the Colloque National Photovoltaïque — Strasbourg, 9th June

Greensolver at Inspiratia Datacentres: Power, Risk & Resilience — London, 18 June

Case Study 2 – Portfolio of 10 projects -15MW AgriPV Technical Due Diligence for Bank Financing

Greensolver will be at Solarplaza France – June 3rd

Solar panels with a human and its tablet and helmet

Case Study : Estimated Yield Assessment for Complex AgriPV Systems

Resources and insights Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC)