Hands shaking during a meeting Hands shaking during a meeting
Wind

P50 and P90: WEEK 2

Mar. 16, 2020
2 minutes

P50 and P90: WEEK 2

When evaluating the Net Yield, each step of the applied methodology is subject to some uncertainties. The identification and quantification of uncertainties is crucial to determine the correct exceedance probabilities.

It is possible to distinguish two classes:

1.The variation in wind

2.The modelling errors

The first category refers to the variability of the wind resource over time. It is known that large variations could be observed from one year to another with no forecast possible. In this context, an uncertainty is calculated to account for inter-annual variation over the wind farm’s lifetime. The longer the project lifetime, the more likely it is to reach the P50 in cumulated production.

The second category refers to the model uncertainty; i.e. uncertainties related to each step of the applied methodology due to the use of mathematical and numerical models; site measurement, vertical profile, reference data, long-term correction, wind flow modelling, wake modelling, density, and power curve.

Conclusion 

As no one can predict the wind over the next 20 years and because the models and methods used for energy yield assessments are subject to errors, the consideration of an uncertainty is crucial when creating a business model. This is all the more relevant as the wind resource over the wind farm site area can be affected over time by evolution in the immediate vicinity: urbanisation, densification of neighboured wind turbines, tree growth etc.

Greensolver highly recommends to consider the P90 or P75 figures instead of the P50, depending on the quality of the energy yield assessment. To determine the quality of an energy yield assessment, a review performed by an independent expert is essential.

By Carla Vico, Technical Asset Manager

Blog

The Latest Renewable Energy News

Handshaking by two women

Why will certifications become necessary in 2026?

Solar Panel with Blue sky

Grid Availability and Curtailment: The Hidden Drivers of Solar Asset Performance

Sun with ondulations in purple

Smart Coexistence: When Sheep, Solar, and AI Work Together

Team of people at a conference

Greensolver will be in Montpellier for Energaia – 10 of december

Battery energy storage open

What the Update to NFPA 855 Means for Energy Storage Safety ?

Battery energy storage open with cables

Tales of BESS #11 – Case study: Technical Due Diligence for BESS project: 17.75MW / 35.5MWh (FR) 

Battery energy storage contener

Tales of BESS #10 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 100MW / 200MWh (GRC) 

Solar farm with solar panels with grass

Safety Concerns in Single-Axis Tracker PV Plants: Risks and Mitigation Strategies

battery energy storage system with solar panels and wind turbines behind

Tales of BESS #9 – Case study: Technical Due Diligence on two Greek BESS projects: Totaling 200MW / 400MWh (GRC)

Resources and insights P50 and P90: WEEK 2