Whether in wind or solar project development, the initial process remains the same. During the pre-construction phase, key factors such as project objectives, environmental conditions, permitting requirements, and location shape the overall design framework. As a result, permit requirements and planning conditions are based on the developer’s assumptions and design choices. The EPC (Engineering, Procurement, and Construction) team must then assess the practicality of these designs to build a more efficient project. 

 

 

In theory, a developer’s design should consider both construction requirements and the operational lifespan of the project. In practice, however, this is not always the case. The primary objective of a developer is often to deliver a project that maximizes profit margins and facilitates a quick asset sale. This approach, while financially driven, can be problematic as it focuses only on the short-term aspects of the project, potentially leading to efficiency and performance challenges in the long run. 

 

 

By Carla Vico – Technical Director 

Blog

The Latest Renewable Energy News

Greensolver will participate in the Energyear 2026 in Madrid – March 24 & 25

Solar panels in line

Design Choices That Define Lifetime Performance

How to Build Reliable BESS Projects in Greece?

Conference energyear 2025

Greensolver will participate in the Energy Storage Summit 2026 in London – February 24 & 25

Data Centers and Renewable Energy in Europe: The Symbiosis Redefining Investment

Greensolver unveils a new brand identity and website to better serve renewable energy stakeholders

PRESS RELEASE – Greensolver Reinvents Its Brand Identity to Deliver Technical and Financial Value

Spain’s Renewable Energy Landscape 2026 : Opportunities and Challenges

Women clapping in an office

Greensolver will be in the 2nd Flexibility and Storage Event by GreenUnivers – 5th of february

Resources and insights Initial Design Decisions Influence the Long-Term Performance of Your Asset